Hurry! Secure your orders for delivery before our end of year break (20th Dec 2024 -13th Jan 2025).
Deadlines:
Custom orders, Cut-to-size orders & Local deliveries for stocked items (20th Nov), Last order dates for any items to be couriered (17th Dec), Last date for Pick-up of stocked items (18th Dec).
Get in touch for more information or if unsure.
Pickup available at
Brisbane (Virginia)
Gold Coast (Molendinar)
Melbourne (Derrimut or Dandenong South)
Newcastle (Cardiff)
Adelaide (Kilburn)
Perth (Jandakot)
20 depots across Australia are now fully operational.
Check individual listings for which products are stocked in which locations.
COLLECT AND COLLECT
Pick up's are only available between 7:30am and 3pm weekdays.
Goods cannot be purchased or viewed at the depot, you'll receive a collection reference and address once the order has been received. (Usually next business day) Leave a note at checkout to say your preferred collection depot.
LOCAL DELIVERY
Delivered on our own purpose made glass and fence carrying trucks within certain postcodes. Expect delivery within 2 weeks, we will advise a delivery date once the order is received.
Usually $120 per delivery. Unless a crane truck is required for large orders of decking, slats or battens in which we can advise delivery cost once purchased.
SHIPPING (Courier)
Calculated at checkout for Australia wide delivery. We ship express.
Duplex stainless steel
Contemporary tapered top to comply with "no toe hold" pool fence regs
Base plate version has 4 x countersunk holes to enable flush fixing,
Modern square shape with minimal visible fixings
Recessed single friction plate for neat finish and easy installation
Tapered Packer included to enable easy tilt adjustment of glass
Structure of spigot maximizes strength
Powder coated dress rings will be provided for the core drill spigots and powder coated slimline domical covers will be provided for the base plated spigots.
Core drill version has a M10 bolt at bottom which enables 60mm of vertical height adjustment, a contact point for earthing and extra anchoring in footings. s
Choose from either the base plated or core drill version and then choose your Dulux Powder Coat Colour, (Duratec and Electro only)
These are powder coated in a very respected powder coating company in Brisbane.
We can also powder coat to Interpon D2525 colours, just ask before you buy,
Vertical face mount spigots are also available to be powder coated too.
Approximate lead times below:
QLD - 2 weeks
NSW - 2 weeks
VIC - 3 weeks
WA - 3 - 4 weeks
SA- 3 weeks
ACT- 3 weeks
NT - 4 weeks
TAS- 4 weeks
Thanks for subscribing!
This email has been registered!